Connect with us

Hi, what are you looking for?

CleanTechnica
Image courtesy of Terrasmart. Terrasmart supplied the racking and built the 66.5 MWac plant 75% faster than the industry average.

Clean Power

Connecticut’s Largest Solar Power Plant Completed

Buffalo, NY — Terrasmart, the renewable energy portfolio of Gibraltar Industries (NASDAQ: ROCK), announces the completion of Connecticut’s largest utility-solar plant located in Canterbury.

Terrasmart surveyed the site, designed a system to stand up to New England weather conditions, manufactured the racking, and executed the mechanical installation of the 66.5-MWAC fixed-tilt system in just seven months, 75 percent faster than the industry average for a system of this size. Working closely with the project’s partners, Terrasmart quickly converted 270 acres of forest, farmland, and reclaimed gravel mining to renewable energy production. The 150,000-module system — created for one of the country’s largest utilities — uses Terrasmart’s ultra-reliable ground screw foundations and GLIDE racks to withstand frost heave, high snow, and high wind. With the completion of this project, Terrasmart has brought its unparalleled project experience to the installation of 1.1 GWs in the Northeast over just the last two years.

“As the largest solar farm in Connecticut and one of the biggest in all of New England, this project demonstrates our full-scope approach to PV execution,” says Terrasmart President Ed McKiernan. “Our end-to-end solution allowed us to value-engineer and deliver a robust system for the utility in record time.”

Terrasmart self-performed 100 percent of the work, deploying 170 team members seven days per week and 10 hours per day to deliver the project on time. The team worked hand-in-hand with the developer and other stakeholders to compress a 130-week project into less than 33 weeks. Designed with reduced hardware and fewer parts, Terrasmart’s adjustable racking system is 33 percent more efficient than other fixed systems.

“Serving as PM for this project was a huge accomplishment and one of the highlights of my career,” says Richard Van Fleet, director of construction at Terrasmart. “I’m proud of our construction team who did everything possible to compress the timeline and make this project successful.”

As an integrated racking provider, Terrasmart used its proprietary surveying system to accelerate installation and improve accuracy. To safeguard system integrity, in-house geotechnical, mechanical, electrical, and civil experts designed the system to withstand icy New England weather with up to 120 mph winds, 35 psf of snow load, and 27 inches of frost depth. Terrasmart’s high-velocity manufacturing facility streamlines metal treatments, adds precision, and increases production speed. To ensure maximum efficiency, the highly trained crew staggered installation and testing by rows, instead of performing the testing sequentially as is typically done.

For more information on how Terrasmart’s survey-to-glass scope delivers project speed to meet aggressive goals, visit terrasmart.com.

Courtesy of Terrasmart

Featured image courtesy of Terrasmart.

 
Appreciate CleanTechnica’s originality and cleantech news coverage? Consider becoming a CleanTechnica Member, Supporter, Technician, or Ambassador — or a patron on Patreon.
 

Don't want to miss a cleantech story? Sign up for daily news updates from CleanTechnica on email. Or follow us on Google News!
 

Have a tip for CleanTechnica, want to advertise, or want to suggest a guest for our CleanTech Talk podcast? Contact us here.
Advertisement
 
Written By

Press releases about cleantech products, cleantech companies, or other cleantech news.

Comments

#1 most loved electric vehicle, solar energy, and battery news & analysis site in the world.

 

Support our work today!

Power CleanTechnica: $3/Month

Tesla News Solar News EV News Data Reports

Advertisement

Advertisement

Advertisement

Tesla News

EV Reviews

Home Efficiency

You May Also Like

Clean Transport

Electric school buses are experiencing rapid growth in the United States, with a nearly 10-fold increase in commitments by school districts and fleet operators in the...

Clean Power

These solar projects were made possible through a 15-year solar power purchase agreement (PPA) with Greenskies, enabling the school district to install the solar...

Cars

The Connecticut Automotive Retailers Association’s public relations firm shared a sweet, heartwarming tweet about Earth Day and their commitment to sustainability and protecting the...

Cars

EV owners across all brands recently showed up in the Connecticut State Capital to show their support for Senate Bill 214. Paul Braren, writer...

Copyright © 2021 CleanTechnica. The content produced by this site is for entertainment purposes only. Opinions and comments published on this site may not be sanctioned by and do not necessarily represent the views of CleanTechnica, its owners, sponsors, affiliates, or subsidiaries.