Connect with us

Hi, what are you looking for?

CleanTechnica

Clean Power

First Solar Could Hit 2.7 GW Of Production In 2016

Originally published on Solar Love.

First Solar is expecting to be fully operational next year and has a nameplate capacity of 2.7 GW, so it might produce 2 GW or more. In fact, the company has 2 GW of contracted projects for the upcoming year, plus a number of others that also are expected to be finished during the same period. That adds up to a lot of solar power being manufactured and installed – especially in just one year.

Southern California First Solar sitesDemand and increasing production line efficiency are contributing to the expected rise in output. The US investment tax credit situation is something that has created an uncertainty and tension. Some people might like to take advantage of it while it is still in place, and others might be balking already, wanting to see what happens in Congress.

(Of course, it should be renewed because it is working, but there are influencers who don’t want solar power to succeed.)

Upgrades to production lines have helped too, “Since the inception of the module end-of-life programme, we have continued to pursue engineering and process improvements to reduce the cost of collecting and recycling the modules. Our continuous improvement efforts have resulted in an automated and continuous flow process, which is significantly lowering the cost of the end-of-life programme,” explained Mark R. Widmar, CFO of First Solar.

Remember Solyndra? It was supposed to have an annual production ranging from 300 to 600 MW. Well, First Solar could blow that amount out of the water in 2016.

If First Solar does achieve such a high rate of production, will the news be blasted repeatedly far and wide like the Solyndra failure was?

Let’s remember that with adequate sunshine, one megawatt of solar power can generate enough electricity to power about 160 homes. Two gigawatts is two thousand megawatts, which is enough for 320,000 homes.

If First Solar achieves this production level in one year, that would be a great accomplishment.

Image Credit: First Solar

Reprinted with permission.

 
Don't want to miss a cleantech story? Sign up for daily news updates from CleanTechnica on email. Or follow us on Google News!
 

Have a tip for CleanTechnica, want to advertise, or want to suggest a guest for our CleanTech Talk podcast? Contact us here.
Advertisement
 
 

Written By

Hello, I have been writing online for some time, and enjoy the outdoors. If you like, you can follow me on Twitter: https://twitter.com/JakeRsol

Comments

You May Also Like

Clean Power

First Solar will build a new solar panel factory in Alabama, thanks in no small part by policies and funding from the federal government.

Clean Power

The US manufacturer First Solar lays plans for more made-in-USA solar panels, drops hint about solar-friendly policy-making.

Clean Power

Intersect Power expected to be one of the largest buyers and operators of First Solar technology by 2027 TEMPE, Arizona — US-headquartered First Solar,...

Copyright © 2023 CleanTechnica. The content produced by this site is for entertainment purposes only. Opinions and comments published on this site may not be sanctioned by and do not necessarily represent the views of CleanTechnica, its owners, sponsors, affiliates, or subsidiaries.