Connect with us

Hi, what are you looking for?

CleanTechnica

Agriculture

Indian State Issues 1.3 Gigawatt Solar Power Tender

The Indian state of Maharashtra has issued a tender for the installation of 1.3 gigawatts of solar power projects.

According to media reports, the entire capacity will be used for supplying electricity to agricultural consumers. The capacity would be spread across 29 districts in Maharashtra. Project developers would be required to set up projects of 25 megawatts or 50 megawatts. Power generated from these projects would be purchased by the state’s power distribution utility, Maharashtra State Electricity Distribution Corporation Limited.

Project developers can submit bids of a maximum Rs 3.05 (¢ 4.10) per kilowatt-hour. They would be required to sign power purchase agreements with the distribution utility for a period of 25 years. Maharashtra has issued similar tenders in the recent past.

Another state, Andhra Pradesh, had also issued a tender to set up solar power projects exclusively to supply power to agricultural consumers. The tender of 6.4 gigawatts capacity was among the largest, if not the largest renewable energy tender, ever issued in India. The tender garnered bids from five developers that offered to set up as much as 14.3 gigawatts.

Adani Green Energy, NTPC, and Torrent Power were among the prominent winners of the Andhra Pradesh tender. The companies secured rights to develop 3.9 gigawatt capacity between them. These projects would be commissioned in large solar power parks spread across the state. Power from these projects would also be purchased by local power distribution utilities through 30-year power purchase agreements. These power purchase agreements are priced at Rs 2.47 to 2.58 (3.52¢ to 3.68¢) per kilowatt-hour.

The Indian government is looking to meet a substantial power demand from the agricultural sector through solar power projects. It has launched the Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM) and has set a target to install 25.7 gigawatts of solar power capacity by 2022. The government plans to install small solar power projects and solar-powered irrigation pumps.


Appreciate CleanTechnica’s originality? Consider becoming a CleanTechnica Member, Supporter, Technician, or Ambassador — or a patron on Patreon.
 
 
Have a tip for CleanTechnica, want to advertise, or want to suggest a guest for our CleanTech Talk podcast? Contact us here.
Written By

An avid follower of latest developments in the Indian renewable energy sector.

Comments

#1 most loved electric vehicle, solar energy, and battery news & analysis site in the world.

 

Support our work today!

Advertisement

Power CleanTechnica: $3/Month

Tesla News Solar News EV News Data Reports

Advertisement

EV Sales Charts, Graphs, & Stats

Advertisement

Our Electric Car Driver Report

30 Electric Car Benefits

Tesla Model 3 Video

Renewable Energy 101 In Depth

solar power facts

Tesla News

EV Reviews

Home Efficiency

You May Also Like

Clean Power

One of India’s largest renewable energy generation companies, Adani Green Energy, has reported stellar financial performance during the first quarter of this year. According...

Clean Power

One of India’s largest renewable power companies, Tata Power Renewable Energy, has secured the rights to develop a large solar power project. According to...

Clean Power

People asserting that SMRs are the primary or only answer to energy generation either don't know what they are talking about, are actively dissembling...

Climate Change

The World Bank estimates that climate change will be responsible for as many as 132 million people being in extreme poverty by 2030. For...

Copyright © 2021 CleanTechnica. The content produced by this site is for entertainment purposes only. Opinions and comments published on this site may not be sanctioned by and do not necessarily represent the views of CleanTechnica, its owners, sponsors, affiliates, or subsidiaries.