Connect with us

Hi, what are you looking for?

CleanTechnica
Image Credit: Zachary Shahan/CleanTechnica

Energy Storage

India Issues Tender For Round-The-Clock Renewable Energy Supply

The Solar Energy Corporation of India recently issued its first tender for round-the-clock renewable energy supply. This opens a major new avenue in India’s rapidly evolving renewable energy sector.

The Solar Energy Corporation of India recently issued its first tender for round-the-clock renewable energy supply. This opens a major new avenue in India’s rapidly evolving renewable energy sector.

Image: Zach Shahan – CleanTechnica.com

SECI has offered 400 megawatts of capacity to project developers under this tender. The minimum capacity developers can bid for is 200 megawatts, while the maximum is the entire 400 megawatts. No tariff threshold has been specified.

Developers are required to quote tariffs for the first year of operation. The tariff will be increased at 4% every year for 15 years after which the tariff shall remain stable. Developers are free to choose the storage capacity of their choice.

Among the most important features of this tender is that the buyers of the generated energy have already been identified. Federally administered regions of Dadra and Nagar Haveli and New Delhi Municipal Corporation (NDMC), located inside India’s capital city, will buy the power generated from these projects.

The two regions are very small in area; while NDMC is believed to have a peak demand of around 400 megawatts, Dadra and Nagar Haveli reported a peak demand of just over 800 megawatts last year. Projects awarded under this tender would likely supply sufficient energy to meet a large majority, if not the entire power demand, in these regions on most days of the year.

There are several other small states and regions in India with limited power demand that can theoretically be managed by efficiently dispatched renewable energy. Chandigarh, Puducherry, Andaman and Nicobar Islands, and Lakshadweep Islands are some of the other federally administered regions which could utilize similar arrangements of round-the-clock renewable energy supply. Tenders for storage-equipped solar power projects have already been issued for Andaman and Lakshadweep Islands.

SECI issued a large storage tender in August. The agency offered 1.2 gigawatts of wind or solar or wind-solar hybrid capacity to developers. As per tender conditions, developers shall be required to supply 300 megawatt-hours per 100 megawatts of installed capacity during specified periods of high demand.

 
Sign up for daily news updates from CleanTechnica on email. Or follow us on Google News!
 

Have a tip for CleanTechnica, want to advertise, or want to suggest a guest for our CleanTech Talk podcast? Contact us here.

Electrifying Industrial Heat for Steel, Cement, & More


I don't like paywalls. You don't like paywalls. Who likes paywalls? Here at CleanTechnica, we implemented a limited paywall for a while, but it always felt wrong — and it was always tough to decide what we should put behind there. In theory, your most exclusive and best content goes behind a paywall. But then fewer people read it! We just don't like paywalls, and so we've decided to ditch ours. Unfortunately, the media business is still a tough, cut-throat business with tiny margins. It's a never-ending Olympic challenge to stay above water or even perhaps — gasp — grow. So ...
If you like what we do and want to support us, please chip in a bit monthly via PayPal or Patreon to help our team do what we do! Thank you!
Written By

An avid follower of latest developments in the Indian renewable energy sector.

Comments

You May Also Like

Cars

BYD has partnered with New Delhi based EV cab service Evera. BYD will deliver 100 e6 station wagon EVs. Evera provides app-based cab services...

Clean Power

One of India’s largest renewable energy companies, Tata Power Renewable Energy, has entered into a power purchase agreement for a solar-wind hybrid project.  The...

Clean Power

Indian solar module manufacturer Insolation Solar has secured funding from a World Bank-backed fund for expansion of its production line.  The funding was released...

Buildings

We've already manufactured an awful lot of steel. There are hundreds of billions of tons of the stuff lying around, much of it obsolete.

Copyright © 2023 CleanTechnica. The content produced by this site is for entertainment purposes only. Opinions and comments published on this site may not be sanctioned by and do not necessarily represent the views of CleanTechnica, its owners, sponsors, affiliates, or subsidiaries.

Advertisement