EDF Joins Masdar Group In 800 Megawatt Dubai Solar Project


Support CleanTechnica's work through a Substack subscription or on Stripe.
Or support our Kickstarter campaign!


Originally published on CleanTechies.

EDF Energies Nouvelles will work with Masdar Group on the 800 megawatt phase 3 of the Mohammed bin Rashid Al Maktoum Solar Park in the United Arab Emirates.

Masdar Group, Fotowatio Renewable Ventures, and Gransolar Group have been joined by EDF Energies Nouvelles just weeks after construction on the third phase of the Mohammed bin Rashid Al Maktoum Solar Park in Dubai began.

The Masdar Group–led consortium was confirmed as the winner of the 800 MW solar power tender that was floated by the Dubai Electricity and Water Authority (DEWA) last year. The phase III tender set a record for lowest-ever solar PV tariff globally at that time. The Masdar-led consortium beat the phase II winning bid of 5.84¢/kWh with a bid of 2.99¢/kWh. Masdar Group and DEWA signed the power purchase agreement for the project in November 2016.

Phase two of the solar power park with 200 megawatts of capacity has already been commissioned. The tender for the 200 megawatt phase four of the solar park will be opened in June of this year. This phase will be based on concentrated solar power technology.

The Mohammed bin Rashid Al Maktoum Solar Park will have an eventual capacity of 5 gigawatts. The initial planned capacity was 1 gigawatt which was subsequently increased to 3 gigawatts, and now 5 gigawatts. Bids of the first 1 gigawatt of capacity have already been awarded.

Reprinted with permission.

Support CleanTechnica via Kickstarter


Sign up for CleanTechnica's Weekly Substack for Zach and Scott's in-depth analyses and high level summaries, sign up for our daily newsletter, and follow us on Google News!
Advertisement
 
Have a tip for CleanTechnica? Want to advertise? Want to suggest a guest for our CleanTech Talk podcast? Contact us here.
Sign up for our daily newsletter for 15 new cleantech stories a day. Or sign up for our weekly one on top stories of the week if daily is too frequent.

CleanTechnica uses affiliate links. See our policy here.

CleanTechnica's Comment Policy


Saurabh

An avid follower of latest developments in the Indian renewable energy sector.

Saurabh has 1037 posts and counting. See all posts by Saurabh