Spain Awards 4 Gigawatts Solar & 1 Gigawatt Wind In Renewables Auction
Sign up for daily news updates from CleanTechnica on email. Or follow us on Google News!
Spain’s Ministry of Energy, Tourism and the Digital Agenda Thursday announced the full list of winners (PDF, Spanish) for the country’s most recent renewable energy auction, which originally was set to be a 3 GW tender but ended up awarding a total of 5 GW, indicating pretty clearly how strong and competitive the bids were.
Further, this latest auction is likely to be much more appreciated by the country’s solar association, Unión Española Fotovoltaica (UNEF), which cried foul at this year’s earlier renewable auction, in which the majority of the awarded capacity was awarded to wind. They definitely had reason to be mildly upset, considering the rules of the auction stipulated that when there was a tie between a wind and solar bid for the maximum discount, the capacity would be awarded to the wind bid.
This time, the playing field had been leveled, and solar walked away with a total of 3,909 MW (megawatts) awarded, while wind took 1,128 MW. The full list of winners is as follows:
Solar Developer | capacity awarded (MW) |
---|---|
Alten El Casar | 13 |
Alter Enersun | 50 |
Biertec 2000 | 0.1 |
Climaster Solar FV | 3.9 |
Cobra Concesiones | 1,550 |
Dalar Solar | 1.6 |
Desarrollos Fotovoltaicos Merdionales | 316 |
Enel Green Power Espana | 338.7 |
Engie | 50 |
Fres Wind Moon Systems | 23.75 |
Gas Natural Fenosa Renovables | 250 |
Gestamp Eolica | 24 |
Grupo Tec Servicios Avanzados | 91.7 |
Isabel Sevillano Martin | 0.5 |
Janez Y Carrera | 1 |
Jorge Energy | 9.4 |
Lipmes | 1.5 |
Lotapera | 182.5 |
Meteo For Energy | 0.3 |
Monegros Solar | 50 |
Operating Business 2 | 20 |
Otras Producciones De Energia Fotovoltaica | 200 |
Planta FV3 | 250 |
Raiola Future | 1.5 |
Rios Renovables | 21 |
Sinlimitsol | 2 |
Solar Fotovoltaica Navarra | 1.15 |
Solarpack | 0.1 |
Solmayor Energias Renovables | 0.42 |
X-Elio Energy | 455 |
Wind Developer | capacity awarded (MW) |
---|---|
Alfanar Co. | 750 |
Boreas Tecnologia | 5 |
Fergo Galicia Vento | 24 |
Greenalia Power | 133.3 |
Grupo Empresarial Enhol | 2.5 |
Hocensa Empresa Constructora | 49 |
Ibervento Infraestrcturas | 171.585 |
Inverolica De Abella | 14 |
Operacion Y Mantenimiento De Minicentrales Hidraul | 6 |
Wind Hunter | 2,4 |
The amount of wind energy might have been smaller in this auction, but it brings the total amount awarded this year up to 4.1 GW for the year, and according to the Spanish Wind Energy Association (AEE) will result in investments in excess of €4.5 billion and job creation of between 25,000–30,000 during construction.
“It is a positive signal for the wind industry, notably the Spanish supply chain,” added WindEurope Chief Policy Officer, Pierre Tardieu. “However, due to the four-year market standstill, we’re playing catch-up. The Spanish government is trying to deploy in the next three years what should have been done in seven. These types of stop-and-go policies are extremely disruptive for the wind supply chain which needs a stable calendar of tenders to thrive.”
Chip in a few dollars a month to help support independent cleantech coverage that helps to accelerate the cleantech revolution!
Have a tip for CleanTechnica? Want to advertise? Want to suggest a guest for our CleanTech Talk podcast? Contact us here.
Sign up for our daily newsletter for 15 new cleantech stories a day. Or sign up for our weekly one if daily is too frequent.
CleanTechnica uses affiliate links. See our policy here.
CleanTechnica's Comment Policy