Connect with us

Hi, what are you looking for?

CleanTechnica
Solar Farm
Image credit: CleanTechnica

Agriculture

Indian State Issues 1.3 Gigawatt Solar Power Tender

The Indian state of Maharashtra has issued a tender for the installation of 1.3 gigawatts of solar power projects.

According to media reports, the entire capacity will be used for supplying electricity to agricultural consumers. The capacity would be spread across 29 districts in Maharashtra. Project developers would be required to set up projects of 25 megawatts or 50 megawatts. Power generated from these projects would be purchased by the state’s power distribution utility, Maharashtra State Electricity Distribution Corporation Limited.

Project developers can submit bids of a maximum Rs 3.05 (¢ 4.10) per kilowatt-hour. They would be required to sign power purchase agreements with the distribution utility for a period of 25 years. Maharashtra has issued similar tenders in the recent past.

Another state, Andhra Pradesh, had also issued a tender to set up solar power projects exclusively to supply power to agricultural consumers. The tender of 6.4 gigawatts capacity was among the largest, if not the largest renewable energy tender, ever issued in India. The tender garnered bids from five developers that offered to set up as much as 14.3 gigawatts.

Adani Green Energy, NTPC, and Torrent Power were among the prominent winners of the Andhra Pradesh tender. The companies secured rights to develop 3.9 gigawatt capacity between them. These projects would be commissioned in large solar power parks spread across the state. Power from these projects would also be purchased by local power distribution utilities through 30-year power purchase agreements. These power purchase agreements are priced at Rs 2.47 to 2.58 (3.52¢ to 3.68¢) per kilowatt-hour.

The Indian government is looking to meet a substantial power demand from the agricultural sector through solar power projects. It has launched the Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM) and has set a target to install 25.7 gigawatts of solar power capacity by 2022. The government plans to install small solar power projects and solar-powered irrigation pumps.

 
 
 
Appreciate CleanTechnica’s originality and cleantech news coverage? Consider becoming a CleanTechnica Member, Supporter, Technician, or Ambassador — or a patron on Patreon.
 

Don't want to miss a cleantech story? Sign up for daily news updates from CleanTechnica on email. Or follow us on Google News!
 

Have a tip for CleanTechnica, want to advertise, or want to suggest a guest for our CleanTech Talk podcast? Contact us here.
Advertisement
 
Written By

An avid follower of latest developments in the Indian renewable energy sector.

Comments

You May Also Like

Clean Power

Welcome to another issue of our India x Cleantech series! On a monthly basis, we are pulling news from across clean technology sectors in...

Clean Power

Private equity investment firm KKR has announced plans to acquire a stake in a budding renewable energy platform in India.  The firm will reportedly...

Batteries

  In Delhi, India, Gogoro Inc. and Zypp Electric have announced a strategic B2B initiative and partnership that will accelerate the urban shift of...

Clean Transport

While European, East Asian, and American EVs get a lot of attention, we have to remember that there’s a wider world out there, and...

Copyright © 2022 CleanTechnica. The content produced by this site is for entertainment purposes only. Opinions and comments published on this site may not be sanctioned by and do not necessarily represent the views of CleanTechnica, its owners, sponsors, affiliates, or subsidiaries.