Worcester County Jail Planning Wind Turbine Installation
Posted in:
Worcester County Jail is jumping on the renewable energy bandwagon and installing a wind turbine test tower for a 12 month trial. The 160 foot tall meteorological tower will gauge wind speed, direction, and turbulence at the prison site. Noise levels, environmental area, and air space will also be evaluated.
- » See also: Storing Renewable Energy in Boxes of Air
- » Get CleanTechnica by RSS or sign up by email.
If the year-long evaluation goes well, the jail plans on installing a 2.5 MW wind turbine— potentially enough power for over 500 households. Eventually, the Sheriff’s Office will install 2 more similarly sized turbines.
The turbines, which should more than cover the jail’s electricity use, will save the county $350,000— much needed cash in an economic climate that has caused many cities to go bankrupt. Extra power will be sold back to the municipal grid.
Photo Credit: CC-licensed by Flickr user Still Burning
Return to: Worcester County Jail Planning Wind Turbine Installation

Social Web